An additional lesson is that if the executing agency’s limited relevant experience of project design and implementation is known at the outset at the project design stage (i.e., as confirmed in the risk assessment), it is necessary to design appropriate mitigation strategies. These could include the following: (i) design smaller pilot projects to gain experience before larger projects are tackled; or (ii) make significant consultant support available in the early stages of implementation to strengthen capacity and ensure timely implementation.
Project Name
Urban Water Supply Project
Project Number
33548-013
Report Date
Report Source
Validation of self-evaluation
Country
Sector
Themes
Applicability