A project performance monitoring system (PPMS) was not required, since an existing system was already in place at Directorate General of Highways. However, ADB did require the conduct of surveys and collection of data for specific performance indicators identified at appraisal, which should have been finalized during the early stage of project implementation.

Project Name

Road Rehabilitation-2 Project

Project Number
34159-013
Report Date
Report Source
Validation of self-evaluation
Country
Report Rating