Although capacity has been developed (though not always retained) at an individual level, the benefits are less evident within MESC or more broadly. Capacity development could have been greater had MESC capacity been thoroughly assessed during design or had design fully considered the absorptive capacity of a small ministry. High staff turnover at the management level also contributed to challenges in building capacity.