Dahanu Solar Power Project

The hedging policy approved at appraisal did not reflect the foreign exchange hedging instruments available in the local market. When exchange rates deteriorated, the hedging policy and the required sponsor support needed to be renegotiated. It is fairly usual to have rolling foreign exchange hedging requirements, rather than the life-of-loan program that was originally documented, and better investigation of the likely options that would be available to the project could have reduced the work required to adapt to the situation as it arose.