Skip to main content
Evaluation Lessons
  • Home
  • Countries
    • Afghanistan
    • Armenia
    • Azerbaijan
    • Bangladesh
    • Bhutan
    • Brunei Darussalam
    • Cambodia
    • China, People's Republic of
    • Cook Islands
    • Federated States of Micronesia
    • Fiji
    • Georgia
    • Hong Kong, China
    • India
    • Indonesia
    • Kazakhstan
    • Kiribati
    • Kyrgyz Republic
    • Lao People’s Democratic Republic
    • Malaysia
    • Maldives
    • Marshall Islands
    • Mongolia
    • Myanmar
    • Nauru
    • Nepal
    • Niue
    • Pakistan
    • Palau
    • Papua New Guinea
    • Philippines
    • Republic of Korea
    • Samoa
    • Singapore
    • Solomon Islands
    • Sri Lanka
    • Taipei,China
    • Tajikistan
    • Thailand
    • Timor-Leste
    • Tonga
    • Turkmenistan
    • Tuvalu
    • Uzbekistan
    • Vanuatu
    • Viet Nam
    • Australia
    • Japan
    • New Zealand
  • Sectors
    • Agriculture, natural resources, and rural development
    • Education
    • Energy
    • Finance
    • Health
    • Industry and trade
    • Information and communication technology
    • Multisector
    • Public sector management
    • Transport
    • Water and other urban infrastructure and services
  • Themes
    • Inclusive Economic Growth
    • Environmentally Sustainable Growth
    • Regional Integration
    • Private Sector Development
    • Governance and Capacity Development
    • Gender Equity and Mainstreaming
    • Knowledge Solutions
    • Partnerships
  • About
  • Home
  • Countries
  • Sectors
  • Themes
  • About

Madhya Pradesh State Roads Sector Project II

No new lessons

Project Name

Madhya Pradesh State Roads Sector Project II

Project Number
37328-013
Report Date
06 Dec 2016
Report Link
https://www.adb.org/documents/india-madhya-pradesh-state-roads-sector-project-ii
Report Source
Validation of self-evaluation
Country
India
Sector
Transport
Road transport (non-urban)
Themes
Inclusive Economic Growth
Governance and Capacity Development
Private Sector Development
Report Rating
Successful

Related Lessons

It is important that the TA is appropriately designed to support the delivery of expected outputs and that it is implemented in a timely manner.…


There are challenges in integrating intermittent renewable energy sources in the electricity system without affecting grid stability, e.g. while…


The project-commissioned monitoring inadequately reported the actual implementation issues at field level. Third party monitoring on an annual…


The program correctly sought to balance power load between the three regions (outcome) to remove transmission bottleneck that would promote proper…


Knowledge gained from projects needs to be shared to optimize benefits. The knowledge developed through the project—the groundwater protection…


Subscribe to our mailing list

6 ADB Avenue,
Mandaluyong City
1550, Metro Manila,
Philippines

 

Phone: +632 632 4444
Fax: +632 636 2444

Other ADB Websites

ADB Compliance Review Panel
Asia Pathways (ADBI Blog)
Asia Regional Integration Center
Asian Bonds Online
Asian Development Blog
Open Access Repository
Statistical Database System

IED Social Media

LinkedIn

Twitter

YouTube

©2024 Independent Evaluation - Asian Development Bank

Footer

  • About