Skip to main content
Evaluation Lessons
  • Home
  • Countries
    • Afghanistan
    • Armenia
    • Azerbaijan
    • Bangladesh
    • Bhutan
    • Brunei Darussalam
    • Cambodia
    • China, People's Republic of
    • Cook Islands
    • Federated States of Micronesia
    • Fiji
    • Georgia
    • Hong Kong, China
    • India
    • Indonesia
    • Kazakhstan
    • Kiribati
    • Kyrgyz Republic
    • Lao People’s Democratic Republic
    • Malaysia
    • Maldives
    • Marshall Islands
    • Mongolia
    • Myanmar
    • Nauru
    • Nepal
    • Niue
    • Pakistan
    • Palau
    • Papua New Guinea
    • Philippines
    • Republic of Korea
    • Samoa
    • Singapore
    • Solomon Islands
    • Sri Lanka
    • Taipei,China
    • Tajikistan
    • Thailand
    • Timor-Leste
    • Tonga
    • Turkmenistan
    • Tuvalu
    • Uzbekistan
    • Vanuatu
    • Viet Nam
    • Australia
    • Japan
    • New Zealand
  • Sectors
    • Agriculture, natural resources, and rural development
    • Education
    • Energy
    • Finance
    • Health
    • Industry and trade
    • Information and communication technology
    • Multisector
    • Public sector management
    • Transport
    • Water and other urban infrastructure and services
  • Themes
    • Inclusive Economic Growth
    • Environmentally Sustainable Growth
    • Regional Integration
    • Private Sector Development
    • Governance and Capacity Development
    • Gender Equity and Mainstreaming
    • Knowledge Solutions
    • Partnerships
  • About
  • Home
  • Countries
  • Sectors
  • Themes
  • About

Yap Renewable Energy Development Project

Inaccurate projections about solar irradiation can lead to suboptimal performance of solar systems.

Project Name

Yap Renewable Energy Development Project

Project Number
44469-013
Report Date
30 Nov 2019
Report Link
https://www.adb.org/projects/documents/fsm-44469-013-pcr
Report Source
Self-evaluation
Country
Federated States of Micronesia
Sector
Energy
Conventional energy generation
Renewable energy generation - solar
Renewable energy generation - wind
Themes
Environmentally Sustainable Growth
Inclusive Economic Growth
Gender Equity and Mainstreaming
Report Rating
Successful

Related Lessons

In addition to the physical works, a water quality online monitoring system was established under the project. The system will be integrated into…


Widespread assistance from development partners (DPs) in times of crisis could lead to fiscal expansion and unsustainable expenditures that…


Experience from the project demonstrates that prompt loan processing and disbursement is crucial to success of such budgetary support provided…


Advance preparation of the bidding documents improve the reliability of cost estimates.


Monitoring and evaluation. The establishment of a monitoring and evaluation system during project inception is important and it should be…


Subscribe to our mailing list

6 ADB Avenue,
Mandaluyong City
1550, Metro Manila,
Philippines

 

Phone: +632 632 4444
Fax: +632 636 2444

Other ADB Websites

ADB Compliance Review Panel
Asia Pathways (ADBI Blog)
Asia Regional Integration Center
Asian Bonds Online
Asian Development Blog
Open Access Repository
Statistical Database System

IED Social Media

LinkedIn

Twitter

YouTube

©2024 Independent Evaluation - Asian Development Bank

Footer

  • About