After the inception mission, the TOR had to be revised to strengthen the assessment of current port operation and propose possible implementation of existing terminals. In future, similar TAs for master planning of the port sector should be designed to cover such diagnosis from the beginning.
Project Name
Strategic Masterplan for Chittagong Port
Project Number
45078-001
Report Date
Report Source
Technical assistance completion reports
Country
Topics