Despite a shortened loan processing period, by the time the loan was eventually disbursed, most of the elements of the stimulus package were expiring. To the extent that loan processing could be further simplified and accelerated in the future, the potential impact of the CSF might be assisted.
Project Name
Countercyclical Support
Project Number
43315-013
Report Date
Report Source
Self-evaluation
Country
Sector