Assam Integrated Flood and Riverbank Erosion Risk Management Investment Program (Tranches 1 and 2; and Multitranche Financing Facility)

Structural and nonstructural interventions require cohesive and integrated program approaches as well as long-term planning. The phased approach taken by this program proved most appropriate, allowing the step-by-step construction of various flood and riverbank erosion management (FRERM) structures while verifying innovative solutions and, in the process, strengthening state and local institutions.