Northern Road Connectivity Project

The concept of level 2 design introduced under the Road Project Preparatory Facility is an effective strategy, particularly when there is no guarantee that the designed roads will be constructed immediately after preparation. This strategy minimizes the risk of outdated designs while saving time and other resources.