Urban Infrastructure Project

Appropriate metrics need to be ensured for each level of the results chain. The output indicators measured outcomes or benefits rather than the physical interventions contracted. That impacted the measurement of output performance during implementation.

Report Date
Project Name

Urban Infrastructure Project

Project Number
44240-013
Report Source
Self-evaluation
Country
Bhutan
Report Rating
Project Cycle Stage
Preparation