Skip to main content
  • Home
  • Countries
    • Afghanistan
    • Armenia
    • Azerbaijan
    • Bangladesh
    • Bhutan
    • Brunei Darussalam
    • Cambodia
    • China, People's Republic of
    • Cook Islands
    • Federated States of Micronesia
    • Fiji
    • Georgia
    • Hong Kong, China
    • India
    • Indonesia
    • Kazakhstan
    • Kiribati
    • Kyrgyz Republic
    • Lao People's Democratic Republic
    • Malaysia
    • Maldives
    • Marshall Islands
    • Mongolia
    • Myanmar
    • Nauru
    • Nepal
    • Niue
    • Pakistan
    • Palau
    • Papua New Guinea
    • Philippines
    • Republic of Korea
    • Samoa
    • Singapore
    • Solomon Islands
    • Sri Lanka
    • Taipei,China
    • Tajikistan
    • Thailand
    • Timor-Leste
    • Tonga
    • Turkmenistan
    • Tuvalu
    • Uzbekistan
    • Vanuatu
    • Viet Nam
    • Australia
    • Japan
    • New Zealand
  • Sectors
    • Agriculture, natural resources, and rural development
    • Education
    • Energy
    • Finance
    • Health
    • Industry and trade
    • Information and communication technology
    • Multisector
    • Public sector management
    • Transport
    • Water and other urban infrastructure and services
  • Themes
    • Inclusive Economic Growth
    • Environmentally Sustainable Growth
    • Regional Integration
    • Private Sector Development
    • Governance and Capacity Development
    • Gender Equity and Mainstreaming
    • Knowledge Solutions
    • Partnerships
  • About

Search

Displaying 1 - 2 of 2

Lesson
A simpler project and phased implementation need to be considered in future similar interventions to allow for sufficient time and attention to the design of subprojects and monitoring arrangements. The feasibility study for the Warangoi hydropower plant proposed short-term works (i.e., constructing a river training wall) and long-term works (i.e., further river retraining and diversion) which were contingent on hydraulic modeling. However, the modeling was not carried out despite water stream measurement being a loan covenant.

Project Number: 41504-013, 41504-023, 41504-025
Project Name: Town Electrification Investment Program (Multitranche Financing Facility and Tranche 2)
Report Date: 30 Nov 2023

Lesson
ADB and its consultants should review the historical performances and previous challenges of similar projects when preparing implementation schedules at approval. The Tranche 1 project included a highly optimistic implementation schedule. The Tranche 2 project was also overly optimistic, although to a lesser extent. Several challenges in procurement, land acquisition, and construction led to significant delays.

Project Number: 41504-013, 41504-023, 41504-025
Project Name: Town Electrification Investment Program (Multitranche Financing Facility and Tranche 2)
Report Date: 30 Nov 2023

Content type

  • Lesson (2)

Countries

  • (-) Papua New Guinea (2)
  • India (5)
  • Kyrgyz Republic (1)
  • Lao People’s Democratic Republic (2)
  • Pakistan (1)
  • Philippines (6)
  • Tajikistan (2)
  • Uzbekistan (1)

Sectors

  • Energy (2)

Themes

  • Inclusive Economic Growth (2)
  • Environmentally Sustainable Growth (2)
  • Private Sector Development (2)
  • Governance and Capacity Development (2)
  • Gender Equity and Mainstreaming (2)
  • Knowledge Solutions (2)
  • Partnerships (2)

Report Year

  • 2023 (2)

Report Source

  • Self-evaluation (2)

Report Rating

  • Successful (2)

Applicability

  • (-) Program-level (2)
  • Country-level (1)
  • Project-level (1)
  • Sector-level (2)

Topics

  • Methodologies / approaches (3)
  • Modality (1)
  • Others (1)
  • Project design (3)
  • Roles and responsibilities (1)
  • Social (1)
  • Stakeholder engagement (1)
  • (-) Technical (2)

Subscribe to our mailing list

6 ADB Avenue,
Mandaluyong City
1550, Metro Manila,
Philippines

 

Phone: +632 632 4444
Fax: +632 636 2444

Other ADB Websites

ADB Compliance Review Panel
Asia Pathways (ADBI Blog)
Asia Regional Integration Center
Asian Bonds Online
Asian Development Blog
Open Access Repository
Statistical Database System

IED Social Media

LinkedIn

X

YouTube

©2026 Independent Evaluation - Asian Development Bank

Footer

  • About
  • Home
  • Countries
  • Sectors
  • Themes
  • About