Skip to main content
Evaluation Lessons
  • Home
  • Countries
    • Afghanistan
    • Armenia
    • Azerbaijan
    • Bangladesh
    • Bhutan
    • Brunei Darussalam
    • Cambodia
    • China, People's Republic of
    • Cook Islands
    • Federated States of Micronesia
    • Fiji
    • Georgia
    • Hong Kong, China
    • India
    • Indonesia
    • Kazakhstan
    • Kiribati
    • Kyrgyz Republic
    • Lao People’s Democratic Republic
    • Malaysia
    • Maldives
    • Marshall Islands
    • Mongolia
    • Myanmar
    • Nauru
    • Nepal
    • Niue
    • Pakistan
    • Palau
    • Papua New Guinea
    • Philippines
    • Republic of Korea
    • Samoa
    • Singapore
    • Solomon Islands
    • Sri Lanka
    • Taipei,China
    • Tajikistan
    • Thailand
    • Timor-Leste
    • Tonga
    • Turkmenistan
    • Tuvalu
    • Uzbekistan
    • Vanuatu
    • Viet Nam
    • Australia
    • Japan
    • New Zealand
  • Sectors
    • Agriculture, natural resources, and rural development
    • Education
    • Energy
    • Finance
    • Health
    • Industry and trade
    • Information and communication technology
    • Multisector
    • Public sector management
    • Transport
    • Water and other urban infrastructure and services
  • Themes
    • Inclusive Economic Growth
    • Environmentally Sustainable Growth
    • Regional Integration
    • Private Sector Development
    • Governance and Capacity Development
    • Gender Equity and Mainstreaming
    • Knowledge Solutions
    • Partnerships
  • About
  • Home
  • Countries
  • Sectors
  • Themes
  • About

Search

Displaying 1 - 1 of 1

Lesson
A close coordination mechanism among project agencies during the design phase can ensure the tracking of developments and continuous review. POWERGRID as the executing agency was responsible for the construction, installation, and commissioning of the transmission assets while the utilization of the project’s assets was the responsibility of National Load Dispatch Center. The asset’s utilization is dependent on external factors like phasing of generation capacities, system management, and demand from the consumers.

Project Number: 44426-016
Project Name: Green Energy Corridor and Grid Strengthening Project
Report Date: 08 Dec 2023

Content type

  • Lesson (1)

Countries

  • India (1)

Sectors

  • (-) Energy (1)
    • Electricity transmission and distribution (1)

Themes

  • Private Sector Development (1)
  • Partnerships (1)

Report Year

  • 2023 (1)

Report Source

  • Validation of self-evaluation (1)

Report Rating

  • Successful (1)

Applicability

  • (-) Sector-level (1)

Topics

  • Coordination and engagement (1)
  • Country context (2)
  • EA/IA capacity development (1)
  • Economic (1)
  • Environmental (1)
  • Finance and financial aspects (1)
  • Financial (4)
  • Financing mechanism (1)
  • Household grid connections (1)
  • Methodologies / approaches (6)
  • Modality (3)
  • Monitoring and evaluation (4)
  • Policy and reform (1)
  • Private sector regulation (1)
  • Procurement (1)
  • Project design (13)
  • Reporting and supervision (1)
  • Roles and responsibilities (1)
  • Sector issuee (1)
  • Sector issues (2)
  • Stakeholder engagement (9)
  • Technical (5)
  • (-) Stakeholder engagement Institutional (1)

Subscribe to our mailing list

6 ADB Avenue,
Mandaluyong City
1550, Metro Manila,
Philippines

 

Phone: +632 632 4444
Fax: +632 636 2444

Other ADB Websites

ADB Compliance Review Panel
Asia Pathways (ADBI Blog)
Asia Regional Integration Center
Asian Bonds Online
Asian Development Blog
Open Access Repository
Statistical Database System

IED Social Media

LinkedIn

Twitter

YouTube

©2024 Independent Evaluation - Asian Development Bank

Footer

  • About