An adequate assessment is needed when setting targets. This project had a few design challenges that could not be addressed during implementation. For the target of serving 3,000 households with new water supply connections and 4,500 with improved ones, financing was not included in the approved project, so could never be achieved. The target of serving 25,000 households with sewer connections was ambitious, as only about 13,680 households would get these connections based on the final engineering designs. Therefore, the project could not fully realize the tangible benefits to households as envisaged.
Project Name
Secondary Towns Integrated Urban Environmental Improvement Project
Project Number
36188-023
Report Date
Report Source
Self-evaluation
Country
Sector
Themes
Applicability
Project Cycle Stage
Preparation