Skip to main content
Evaluation Lessons
  • Home
  • Countries
    • Afghanistan
    • Armenia
    • Azerbaijan
    • Bangladesh
    • Bhutan
    • Brunei Darussalam
    • Cambodia
    • China, People's Republic of
    • Cook Islands
    • Federated States of Micronesia
    • Fiji
    • Georgia
    • Hong Kong, China
    • India
    • Indonesia
    • Kazakhstan
    • Kiribati
    • Kyrgyz Republic
    • Lao People’s Democratic Republic
    • Malaysia
    • Maldives
    • Marshall Islands
    • Mongolia
    • Myanmar
    • Nauru
    • Nepal
    • Niue
    • Pakistan
    • Palau
    • Papua New Guinea
    • Philippines
    • Republic of Korea
    • Samoa
    • Singapore
    • Solomon Islands
    • Sri Lanka
    • Taipei,China
    • Tajikistan
    • Thailand
    • Timor-Leste
    • Tonga
    • Turkmenistan
    • Tuvalu
    • Uzbekistan
    • Vanuatu
    • Viet Nam
    • Australia
    • Japan
    • New Zealand
  • Sectors
    • Agriculture, natural resources, and rural development
    • Education
    • Energy
    • Finance
    • Health
    • Industry and trade
    • Information and communication technology
    • Multisector
    • Public sector management
    • Transport
    • Water and other urban infrastructure and services
  • Themes
    • Inclusive Economic Growth
    • Environmentally Sustainable Growth
    • Regional Integration
    • Private Sector Development
    • Governance and Capacity Development
    • Gender Equity and Mainstreaming
    • Knowledge Solutions
    • Partnerships
  • About
  • Home
  • Countries
  • Sectors
  • Themes
  • About

Integrated Citarum Water Resources Management Investment Program

The design of integrated water resources management (IWRM) investments has to be simple.

Project Name

Integrated Citarum Water Resources Management Investment Program

Project Number
37049-013
37049-023
Report Date
16 Oct 2018
Report Link
https://www.adb.org/projects/documents/ino-37049-013-37049-023-pcr
Report Source
Self-evaluation
Country
Indonesia
Sector
Agriculture, natural resources, and rural development
Water-based natural resources management
Themes
Environmentally Sustainable Growth
Inclusive Economic Growth
Gender Equity and Mainstreaming
Governance and Capacity Development
Report Rating
Unsuccessful
Applicability
Sector-level
Project Cycle Stage
Preparation

Related Lessons

Technical experts need to be contracted early in the project cycle to prepare sound engineering designs and cost estimates.


Project modality needs to match the intended scope and existing implementation capacity of the executing and implementing agencies (EAs/IAs).


In road projects that address rural development, socioeconomic data on the impact of the project and traffic volumes are often difficult to obtain…


Continuous consultations with communities throughout the project cycle are important for meaningful adaptations in project design and avoidance of…


As a development bank, identifying value addition to road infrastructure investments in the DMF will give more relevance to ADB interventions.


Subscribe to our mailing list

6 ADB Avenue,
Mandaluyong City
1550, Metro Manila,
Philippines

 

Phone: +632 632 4444
Fax: +632 636 2444

Other ADB Websites

ADB Compliance Review Panel
Asia Pathways (ADBI Blog)
Asia Regional Integration Center
Asian Bonds Online
Asian Development Blog
Open Access Repository
Statistical Database System

IED Social Media

LinkedIn

Twitter

YouTube

©2024 Independent Evaluation - Asian Development Bank

Footer

  • About