Bukidnon Integrated Area Development Project

The water availability for the irrigation schemes appears to have been underestimated at the design stage. In particular, it was found that the Sagayon communal irrigation system or CIS (if implemented) would have been able to provide irrigation water to less than 35% of the area planned.