Bihar Power System Improvement Project
The project design included measures to improve billing and collection. Considering the excessive aggregate technical and commercial losses, a project design could include measures for reducing commercial loss that were being promoted by the government and being implemented in other areas e.g., high voltage distribution system in urban areas, use of aerial bundle conductors, and segregation of agricultural and domestic power supply in rural areas.