The project design included measures to improve billing and collection. Considering the excessive aggregate technical and commercial losses, a project design could include measures for reducing commercial loss that were being promoted by the government and being implemented in other areas e.g., high voltage distribution system in urban areas, use of aerial bundle conductors, and segregation of agricultural and domestic power supply in rural areas.
Project Name
Bihar Power System Improvement Project
Project Number
41626-013
Report Date
Report Source
Validation of self-evaluation
Country
Applicability
Project Cycle Stage
Preparation