Adequacy of designs for works in difficult soil conditions. For the reconstruction of road sections in difficult terrain and soil conditions, the initial designs were not based on adequate geotechnical investigations. The design reviews therefore took longer, contributing to cost increases and delays in the start of the works.
Report Date
Project Name
Road Rehabilitation - 2 Project
Project Number
34159-013
Report Source
Self-evaluation
Country
Indonesia
