Skip to main content
Evaluation Lessons
  • Home
  • Countries
    • Afghanistan
    • Armenia
    • Azerbaijan
    • Bangladesh
    • Bhutan
    • Brunei Darussalam
    • Cambodia
    • China, People's Republic of
    • Cook Islands
    • Federated States of Micronesia
    • Fiji
    • Georgia
    • Hong Kong, China
    • India
    • Indonesia
    • Kazakhstan
    • Kiribati
    • Kyrgyz Republic
    • Lao People's Democratic Republic
    • Malaysia
    • Maldives
    • Marshall Islands
    • Mongolia
    • Myanmar
    • Nauru
    • Nepal
    • Niue
    • Pakistan
    • Palau
    • Papua New Guinea
    • Philippines
    • Republic of Korea
    • Samoa
    • Singapore
    • Solomon Islands
    • Sri Lanka
    • Taipei,China
    • Tajikistan
    • Thailand
    • Timor-Leste
    • Tonga
    • Turkmenistan
    • Tuvalu
    • Uzbekistan
    • Vanuatu
    • Viet Nam
    • Australia
    • Japan
    • New Zealand
  • Sectors
    • Agriculture, natural resources, and rural development
    • Education
    • Energy
    • Finance
    • Health
    • Industry and trade
    • Information and communication technology
    • Multisector
    • Public sector management
    • Transport
    • Water and other urban infrastructure and services
  • Themes
    • Inclusive Economic Growth
    • Environmentally Sustainable Growth
    • Regional Integration
    • Private Sector Development
    • Governance and Capacity Development
    • Gender Equity and Mainstreaming
    • Knowledge Solutions
    • Partnerships
  • About
  • Home
  • Countries
  • Sectors
  • Themes
  • About

Water Resources Management Sector Project

The national feasibility studies, design, and master bidding documents shall be completed within 60 days after loan approval; and

Project Name

Water Resources Management Sector Project

Project Number
40086-013
Report Date
31 Aug 2017
Report Link
https://www.adb.org/projects/documents/uzb-40086-013-pcr
Report Source
Self-evaluation
Country
Uzbekistan
Sector
Agriculture, natural resources, and rural development
Irrigation
Rural water policy, institutional and capacity development
Themes
Environmentally Sustainable Growth
Inclusive Economic Growth
Gender Equity and Mainstreaming
Governance and Capacity Development
Report Rating
Successful

Related Lessons

Baseline information is also critical to ensure adequate project design and monitoring of achievements.


Having a combination of various types of reports, workshops and communication tools/approaches was effective and efficient for project management…


Inaccurate projections about solar irradiation can lead to suboptimal performance of solar systems.


Issues regarding legal and/or technical aspects of operation and maintenance (O&M) planning and funding, measures for cost recovery, tariff…


Incorporating lessons and risk mitigation. Previous ADB-funded road projects in Mongolia had shown that the MRT and contractors have limited…


Subscribe to our mailing list

6 ADB Avenue,
Mandaluyong City
1550, Metro Manila,
Philippines

 

Phone: +632 632 4444
Fax: +632 636 2444

Other ADB Websites

ADB Compliance Review Panel
Asia Pathways (ADBI Blog)
Asia Regional Integration Center
Asian Bonds Online
Asian Development Blog
Open Access Repository
Statistical Database System

IED Social Media

LinkedIn

Twitter

YouTube

©2024 Independent Evaluation - Asian Development Bank

Footer

  • About