Skip to main content
Evaluation Lessons
  • Home
  • Countries
    • Afghanistan
    • Armenia
    • Azerbaijan
    • Bangladesh
    • Bhutan
    • Brunei Darussalam
    • Cambodia
    • China, People's Republic of
    • Cook Islands
    • Federated States of Micronesia
    • Fiji
    • Georgia
    • Hong Kong, China
    • India
    • Indonesia
    • Kazakhstan
    • Kiribati
    • Kyrgyz Republic
    • Lao People’s Democratic Republic
    • Malaysia
    • Maldives
    • Marshall Islands
    • Mongolia
    • Myanmar
    • Nauru
    • Nepal
    • Niue
    • Pakistan
    • Palau
    • Papua New Guinea
    • Philippines
    • Republic of Korea
    • Samoa
    • Singapore
    • Solomon Islands
    • Sri Lanka
    • Taipei,China
    • Tajikistan
    • Thailand
    • Timor-Leste
    • Tonga
    • Turkmenistan
    • Tuvalu
    • Uzbekistan
    • Vanuatu
    • Viet Nam
    • Australia
    • Japan
    • New Zealand
  • Sectors
    • Agriculture, natural resources, and rural development
    • Education
    • Energy
    • Finance
    • Health
    • Industry and trade
    • Information and communication technology
    • Multisector
    • Public sector management
    • Transport
    • Water and other urban infrastructure and services
  • Themes
    • Inclusive Economic Growth
    • Environmentally Sustainable Growth
    • Regional Integration
    • Private Sector Development
    • Governance and Capacity Development
    • Gender Equity and Mainstreaming
    • Knowledge Solutions
    • Partnerships
  • About
  • Home
  • Countries
  • Sectors
  • Themes
  • About

Integrated Development of Key Townships in Central Liaoning

Competitive market conditions are favorable to improving the quality of engineering designs and the accuracy of project cost estimates.

Project Name

Integrated Development of Key Townships in Central Liaoning

Project Number
44021-013
Report Date
30 Sep 2021
Report Source
Self-evaluation
Country
China, People's Republic of
Sector
Energy
Transport
Water and other urban infrastructure and services
Energy utility services
Urban roads and traffic management
Urban policy, institutional and capacity development
Urban sewerage
Applicability
Project-level
Project Cycle Stage
Preparation
Topics
Engineering designs, Project cost estimates

Related Lessons

Make sure that the risk is mitigated and mitigation measures are implemented effectively, most especially when the lack of commitment is a high…


With lack of progress on sludge and wastewater management a significant shortcoming of the project, the government could draw on global best…


Consultants should be fielded early in project implementation.


Flood control measures mitigate impact of extreme weather events. Functional linkage of dams and discharge channels is crucial for effective flood…


Robust due diligence in consultant and contractor selection is essential to ensuring smooth and successful project implementation.


Subscribe to our mailing list

6 ADB Avenue,
Mandaluyong City
1550, Metro Manila,
Philippines

 

Phone: +632 632 4444
Fax: +632 636 2444

Other ADB Websites

ADB Compliance Review Panel
Asia Pathways (ADBI Blog)
Asia Regional Integration Center
Asian Bonds Online
Asian Development Blog
Open Access Repository
Statistical Database System

IED Social Media

LinkedIn

Twitter

YouTube

©2024 Independent Evaluation - Asian Development Bank

Footer

  • About