To ensure efficient contractor performance, local contractor ability and capacity needs to be assessed in advance to determine appropriate contract packaging and apply single step procurement procedures. Project preparatory technical assistance report shall include a section or appendix on the local contracting and consultant capacity assessment and Report and Recommendations of the President is to propose measures to gap the capacity constraints.
Project Name
Road Maintenance and Upgrading (Sector) Project
Project Number
32124-013
32124-023
Report Date
Report Source
Self-evaluation
Country
Themes