Skip to main content
Evaluation Lessons
  • Home
  • Countries
    • Afghanistan
    • Armenia
    • Azerbaijan
    • Bangladesh
    • Bhutan
    • Brunei Darussalam
    • Cambodia
    • China, People's Republic of
    • Cook Islands
    • Federated States of Micronesia
    • Fiji
    • Georgia
    • Hong Kong, China
    • India
    • Indonesia
    • Kazakhstan
    • Kiribati
    • Kyrgyz Republic
    • Lao People’s Democratic Republic
    • Malaysia
    • Maldives
    • Marshall Islands
    • Mongolia
    • Myanmar
    • Nauru
    • Nepal
    • Niue
    • Pakistan
    • Palau
    • Papua New Guinea
    • Philippines
    • Republic of Korea
    • Samoa
    • Singapore
    • Solomon Islands
    • Sri Lanka
    • Taipei,China
    • Tajikistan
    • Thailand
    • Timor-Leste
    • Tonga
    • Turkmenistan
    • Tuvalu
    • Uzbekistan
    • Vanuatu
    • Viet Nam
    • Australia
    • Japan
    • New Zealand
  • Sectors
    • Agriculture, natural resources, and rural development
    • Education
    • Energy
    • Finance
    • Health
    • Industry and trade
    • Information and communication technology
    • Multisector
    • Public sector management
    • Transport
    • Water and other urban infrastructure and services
  • Themes
    • Inclusive Economic Growth
    • Environmentally Sustainable Growth
    • Regional Integration
    • Private Sector Development
    • Governance and Capacity Development
    • Gender Equity and Mainstreaming
    • Knowledge Solutions
    • Partnerships
  • About
  • Home
  • Countries
  • Sectors
  • Themes
  • About

Jaipur Metro Rail Line 1-Phase B Project

The outcome performance indicator of a loan project that is deliberately designed to establish a reasonable cause-effect relationship between outputs and outcome can ensure a logical appropriateness and continuum of the design and monitoring framework results chain.

Project Name

Jaipur Metro Rail Line 1-Phase B Project

Project Number
46417-001
Report Date
14 Nov 2023
Report Link
https://www.adb.org/documents/india-jaipur-metro-rail-line-1-phase-b-project
Report Source
Validation of self-evaluation
Country
India
Sector
Transport
Urban public transport
Themes
Environmentally Sustainable Growth
Inclusive Economic Growth
Report Rating
Less than successful
Applicability
Results framework and methodology level
Project Cycle Stage
Preparation
Topics
Indicators
Monitoring and evaluation

Related Lessons

More careful assessment of results of institutional capacity reviews during project processing could avoid major revision of project components…


The program’s implementation delays mirror the experience of other ADB health sector investments, indicating constraints to project readiness in…


Providing women with livelihood skills training, aside from jobs during can construction, can maximize the gender benefits of ADB-assisted road…


The imposition of sewerage tariffs needs to be carefully thought out and based on a thorough study, as these could discourage low-income…


Matching grants help build investor confidence.


Subscribe to our mailing list

6 ADB Avenue,
Mandaluyong City
1550, Metro Manila,
Philippines

 

Phone: +632 632 4444
Fax: +632 636 2444

Other ADB Websites

ADB Compliance Review Panel
Asia Pathways (ADBI Blog)
Asia Regional Integration Center
Asian Bonds Online
Asian Development Blog
Open Access Repository
Statistical Database System

IED Social Media

LinkedIn

Twitter

YouTube

©2024 Independent Evaluation - Asian Development Bank

Footer

  • About